Wang Haron & Goh provides engineering support for earthworks, piling, foundations, basement construction, marine structures and reclamation projects in Sabah and Malaysia. Marine and coastal projects require careful coordination of surveys, ground conditions, water levels, access, temporary works, construction sequence and long-term performance.
The public WHG project history includes marine surveys, sea-wall and reclamation work, road surveys, piling-related work and industrial or port-related infrastructure.
Discuss your earthworks or marine project
Earthworks and foundation services
– Site formation and earthworks
– Bored piling and sheet piling
– Basement construction
– Dewatering
– Soil investigation and foundation coordination
– Demolition and concrete works
– Slope and retaining considerations
Marine and coastal services
– Jetty and wharf engineering
– Harbour and port infrastructure
– Sea walls and foreshore protection
– Reclamation and dredging coordination
– Marine piling
– Hydrographic and engineering surveys
– Offshore or industrial marine facilities
Wang Haron & Goh Sdn Bhd Engineering have successfully completed numerous projects which includes piling foundations, earthworks, basement construction and also marine construction & reclamation in Malaysia.
Over the years, our team have gandered the expertise in earthworks, marine jetty construction, sheet piling, demolition, bored piling, harbour reclamation, de-watering, marina piling, and concrete construction works.
Sabah Shipyard, Labuan (1972)
- Hydrographic survey, design of sea-wall for depths 18 feet below mean sea level, and reclamation works for 30 acres of foreshore, inclusive of drainage and road network for the whole development.
Sapangar Port Survey
- Hydrographic and engineering surveys at Sapangar Bay for new heavy industrial areas and oil terminal.
Labuan Industrial Estate
- Hydrographic and engineering survey for the eastern forshores of Rancha-Rancha, Labuan for SEDCO Industrial Estate.
Orchid Farm Dam
- Design, detailed engineering and survey for an earth dam to retain an artificial lake of approximately 90 acres for cultivation of tropical orchids.
Seri Pagi Dam
- Coordinated soil investigation, design surveys and construction of a 45 feet high earth dam to impound approximately 11 million gallons of water for a new village of 450 household in Sandakan District.
Bukit Manggis Road Survey
- Field Control Surveys for vertical and horizontal alignment for approximately 8 miles of Trunk Roads under the Third Malaysia Plan.
Kota Kinabalu Road Survey
- Field Control Surveys for vertical and horizontal alignment for approximately 5 miles of Feeder Roads under the Third Malaysia Plan.
Karangawan Road
- Route location, control survey and design of vertical and horizontal alignment (approximately 3.5 miles)
Melongkolong Road
- Route location, control surveys and design of vertical and horizontal alignment of Feeder Roads to JKR standards (approximately 25 miles)
Road UpgradinG WORKS FOR JKR
- Langkon – Kudat Road: 22 miles
- Menggatal – Kota Belud Road: 30 miles
- Inspect, check and survey all existing road pavements, road shoulders, drains & culverts. Determine the minimum standard requirements and prepare tender documents, tenders, evaluation of tenders and contract supervision and management.

FAQ
What is marine piling?
Marine piling installs deep foundation elements in or near water to support jetties, wharves, marine buildings and other coastal structures. The method depends on ground, water, access and structural requirements.
Does earthworks engineering include foundations?
Earthworks and foundation design are related but distinct disciplines. They should be coordinated with the structural and geotechnical requirements of the project.
Can WHG support coastal and industrial projects?
WHG’s public project history includes marine, industrial, port and reclamation-related work. Confirm the specific appointment and available team for a new project.
Send WHG the project location, site conditions and proposed marine or earthworks scope.

