Proposed Renovation to High Court Building – March 1996

  • Project funded by the Federal Fund under JPPS to renovate and extend the existing High Court Building. The existing High Court building which is about 30 years old have been transformed with a new look.

Penampang Sports Complex (1984 – 1989)

  • Penampang Sports Complex was built in KK which function as a complementary venue to the Likas Sports Complex to host sports activities locally and internationally. The project was divided into 3 phases namely the earthworks, grandstand cum auxiliary works ie. playing fields and swimming pool / club house.

Univeriti Sabah Malaysia (Phase 1 – 2)

a) Pusat Multimedia (Phase 2B)
b) Sekolah Psikologi dan Kerja Sosial (Phase 2A)
c) Sekolah Pembangunan Perkhidmatan Sosial – Building Package (Phase 1B)
d) Infrastructure package for 6 schools – Sekolah Perniagaan Dan Ekonomi, Sekolah Penataran Ilmu Dan Bahasa, Sekolah Sains Sosial, Sekolah Sains Dan Teknologi, Dewan Kuliah Pusat dan Sekolah Pembangunan Perkhidmatan Sosial (Phase 1A)
e) 66KV Substations and all 11KV Substations

Public Buildings

  • Responsible for structural design and supervision. The major ones undertaken by firm are as follows:-

a) Papar Community Centre, Papar
b) Basel Parish Hall, Kota Kinabalu
c) Penampang Parish Hall, Penampang
d) SDA Church Hall, Reservoir road, Kota Kinabalu
e) SDA School Hall and Classrooms, Tamparuli
f) Red Crescent Office Extension, Kota Kinabalu
g) Church at Kg. Melangkap Baru, Kota Belud
h) Clock Tower at Lahad Datu Town Centre
i) Ceremonial Grandstand, Kota Belud

Proposed Community Centre for Kota Belud – 2001

  • Estimated at cost of $7 million. The project is located at Kota Belud and funded by the Ministry of Housing and Local Government. When completed, it would have a mini-auditorium, an open gallery wtih seating capacity of 2000 and a performance stage.