Specialty
 
PROJECT HISTORY

Study on Failure to Retaining Wall at Taman Pekway(Austral Park) (Phase II)
Responsible for the preparation of report of the causes that led to the failure to the retaining wall at Austral Park, Kepayan Ridge.

Landslide at Mojog Water Treatment Plant Site
Responsible for the preparation of report towards the cause of the landslide.

Report on damage to JKR concrete channel and Third Party House at Kg. Cecily, Kebun Cina, Sandakan
Responsible for the preparation of report of the causes that led to the failure to the JKR concrete channel.

Structural Appraisal to Existing 5-storey hotel building at Lot 21, Kampung Air
Structural appraisal and design check as to whether an additional floor is viable.

Repair & Rehabilitation to Existing Bank Pertanian Kota Kinabalu Branch Building & Adjacent 4-storey Building (Lot 2 & 3), Jalan Gaya, Kota Kinabalu
Responsible for the initial Structural appraisal report of the said building and at a later stage, coordinated the repair and rehabilitation of the said building.
       
Cadangan Ubahsuai dan Tambahan Bangunan Mahkamah Tinggi Lama, Kota Kinabalu
Government-appointed civil and structural engineer for the renovation and additional building works to the Kota Kinabalu High Court. Also, prepared the Structural Repair Assessment and Report as well as supervised the structural repair works to existing building.

Study on Existing Telekom Telecommunications tower at various locations in Sabah & W.P. Labuan
Carry out engineering analysis of the tower superstructure to support new proposed microwave disc(s) based on as built measurements and make necessary recommendations.

Investigation Works
 
In addition to designing new structures, alterations and extensions to existing buildings, the firm carries out investigation prepares reports and advises property owners on existing structures where faults have occured and insurance companies in connection with insurance claims and liabilities.
 
Copyright Eyetalk Productions 2006