Sabah Shipyard, Labuan (1972)
Hydrographic survey, design of sea-wall for depths 18 feet below mean sea level, and reclaimation works for 30 acres of foreshore, inclusive of drainage and road network for the whole development.
Sapangar Port Survey
Hydrographic and engineering surveys at Sapangar Bay for new heavy industrial areas and oil terminal.
Labuan Industrial Estate
Hydrographic and engineering survey for the eastern forshores of Rancha-Rancha, Labuan for SEDCO Industrial Estate.
Orchid Farm Dam
Design, detailed engineering and survey for an earth dam to retain an artificial lake of approximately 90 acres for cultivation of tropical orchids.
Seri Pagi Dam
Coordinated soil investigation, design surveys and construction of a 45 feet high earth dam to impound approximately 11 million gallons of water for a new village of 450 household in Sandakan District.
Bukit Manggis Road Survey
Field Control Surveys for vertical and horizontal alignment for approximately 8 miles of Trunk Roads under the Third Malaysia Plan.
Kota Kinabalu Road Survey
Field Control Surveys for vertical and horizontal alignment for approximately 5 miles of Feeder Roads under the Third Malaysia Plan.
Karangawan Road
Route location, control survey and design of vertical and horizontal alignment (approximately 3.5 miles)
Melongkolong Road
Route location, control surveys and design of vertical and horizontal alignment of Feeder Roads to JKR standards (approximately 25 miles)
Road Upgrading Works for J.K.R
1. Langkon - Kudat Road: 22 miles
2. Menggatal - Kota Belud Road: 30 miles
Inspect, check and survey all existing road pavements, road shoulders, drains & culverts. Determine the minimum standard requirements and prepare tender documents, tenders, evaluation of tenders and contract supervision and management.